Safety Bypass and Override Register Template
A register of active and closed bypasses, inhibits and overrides on trips, interlocks and alarms. It shows how long each bypass has been in place and flags bypasses past their planned removal date.
Download
- How to Use sheet with steps
- Template sheet, blank and ready
- Example sheet, filled in
- 126 built in formulas
- A4 landscape print setup
- Works in Excel, Google Sheets and LibreOffice
Preview of the Filled Example
This is the Example sheet from the download, so you can see exactly how the completed safety bypass and override register looks.
Bypasses and overrides
| Tag / function | Description | Reason | Applied | Planned removal | Removed | Days open | Compensating measures | Approved by | Status | SIS? | MOC no | Notes |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PSHH 1101 | Steam header HH trip | Transmitter replacement | 22 Oct 2026 | 25 Oct 2026 | 2 | Operator at panel, PT 1101 B/C in 1oo2 | Area authority | Open | Yes | |||
| LAL 4102 | Tank low level alarm | Faulty switch | 12 Oct 2026 | 19 Oct 2026 | 12 | Hourly field check of level | Shift supervisor | OVERDUE | No | |||
| XV 4101 PST | Partial stroke test inhibit | Valve maintenance | 04 Oct 2026 | 09 Oct 2026 | 08 Oct 2026 | 4 | Valve locked open | Area authority | Closed | Yes |
About the Safety Bypass and Override Register
Bypassed trips are one of the most common contributors to process incidents, because a forgotten bypass leaves a hazard unprotected. A visible register with approvals, compensating measures and overdue flags keeps every bypass under control.
How to fill in this template
- Add a row as soon as a trip, alarm or interlock is bypassed, with the reason, approval and compensating measures.
- Set a planned removal date.
- Enter the removal date when the bypass is taken off; status changes to Closed.
- Review the register every shift: OVERDUE and REVIEW items need action.
- Long or repeated bypasses should be raised as an MOC.
What the formulas do
- Days open = today (or removal date) − applied date.
- Status: Closed when removed; OVERDUE after the planned removal date; REVIEW when open longer than the review limit; otherwise Open.
Related tools
Frequently Asked Questions
What is a compensating measure?
A temporary measure that provides protection while the bypass is in place, such as an operator watching a backup reading or a valve locked in a safe position.
Who should approve a bypass?
An authorised person defined in the bypass procedure; SIS bypasses normally need a higher level of approval.
When does a bypass need an MOC?
When it stays in place beyond the time allowed by the procedure or becomes a long term change.