Maintenance · Free Template

Safety Bypass and Override Register Template

A register of active and closed bypasses, inhibits and overrides on trips, interlocks and alarms. It shows how long each bypass has been in place and flags bypasses past their planned removal date.

Excel (.xlsx)Printable PDFFilled exampleFree, no sign up

Download

  • How to Use sheet with steps
  • Template sheet, blank and ready
  • Example sheet, filled in
  • 126 built in formulas
  • A4 landscape print setup
  • Works in Excel, Google Sheets and LibreOffice

Preview of the Filled Example

This is the Example sheet from the download, so you can see exactly how the completed safety bypass and override register looks.

Plant / unitBoiler house
Register ownerShift supervisor
Maximum days without review7
ProcedureBypass procedure BP 001

Bypasses and overrides

Tag / functionDescriptionReasonAppliedPlanned removalRemovedDays openCompensating measuresApproved byStatusSIS?MOC noNotes
PSHH 1101Steam header HH tripTransmitter replacement22 Oct 202625 Oct 20262Operator at panel, PT 1101 B/C in 1oo2Area authorityOpenYes
LAL 4102Tank low level alarmFaulty switch12 Oct 202619 Oct 202612Hourly field check of levelShift supervisorOVERDUENo
XV 4101 PSTPartial stroke test inhibitValve maintenance04 Oct 202609 Oct 202608 Oct 20264Valve locked openArea authorityClosedYes
Active bypasses:2  ·  Overdue:1  ·  SIS bypasses active:1
Advertisement

About the Safety Bypass and Override Register

Bypassed trips are one of the most common contributors to process incidents, because a forgotten bypass leaves a hazard unprotected. A visible register with approvals, compensating measures and overdue flags keeps every bypass under control.

How to fill in this template

  1. Add a row as soon as a trip, alarm or interlock is bypassed, with the reason, approval and compensating measures.
  2. Set a planned removal date.
  3. Enter the removal date when the bypass is taken off; status changes to Closed.
  4. Review the register every shift: OVERDUE and REVIEW items need action.
  5. Long or repeated bypasses should be raised as an MOC.

What the formulas do

  • Days open = today (or removal date) − applied date.
  • Status: Closed when removed; OVERDUE after the planned removal date; REVIEW when open longer than the review limit; otherwise Open.

Related tools

Advertisement

Frequently Asked Questions

What is a compensating measure?

A temporary measure that provides protection while the bypass is in place, such as an operator watching a backup reading or a valve locked in a safe position.

Who should approve a bypass?

An authorised person defined in the bypass procedure; SIS bypasses normally need a higher level of approval.

When does a bypass need an MOC?

When it stays in place beyond the time allowed by the procedure or becomes a long term change.

You May Also Like

Learn more on the blog

What is SIL (safety integrity level)

A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.

Read Full Article