Instrument Commissioning Progress Tracker Template
Track instrument commissioning by system: total loops, installed, calibrated, cold loop checked and hot loop checked, with % complete for each stage and overall progress.
Download
- How to Use sheet with steps
- Template sheet, blank and ready
- Example sheet, filled in
- 168 built in formulas
- A4 landscape print setup
- Works in Excel, Google Sheets and LibreOffice
Preview of the Filled Example
This is the Example sheet from the download, so you can see exactly how the completed instrument commissioning progress tracker looks.
Progress by system
| System | Description | Total loops | Installed | Calibrated | Cold loop | Hot loop | Installed % | Cold loop % | Hot loop % | Overall % | Remarks |
|---|---|---|---|---|---|---|---|---|---|---|---|
| SYS 100 | Feed water | 42 | 42 | 40 | 38 | 20 | 1 | 0.904762 | 0.47619 | 0.833333 | |
| SYS 200 | Steam and drum | 55 | 50 | 44 | 30 | 0 | 0.909091 | 0.545455 | 0 | 0.563636 | |
| SYS 300 | Fuel gas | 36 | 36 | 36 | 36 | 36 | 1 | 1 | 1 | 1 | Ready for handover |
| SYS 400 | Flue gas and CEMS | 18 | 10 | 4 | 0 | 0 | 0.555556 | 0 | 0 | 0.194444 | Analysers delayed |
About the Instrument Commissioning Progress Tracker
Commissioning progress is easier to manage when every system shows the same stages. This tracker makes bottlenecks visible, such as loops installed but not cold loop checked.
How to fill in this template
- List systems and total loops from the instrument index.
- Update counts for each stage weekly.
- Percentages calculate automatically.
- Use remarks for blockers.
- Share the summary in progress meetings.
What the formulas do
- Stage % = stage count ÷ total loops.
- Overall % = (installed + calibrated + cold loop + hot loop) ÷ (4 × total).
Related tools
Frequently Asked Questions
Why track by system?
Handover usually happens system by system.
What is the difference between cold and hot loop?
Cold loop checks wiring and signals without process; hot loop checks with the real process running.
Can I add more stages?
Yes, add columns and update the overall formula.
Learn more on the blog
Cold loop and hot loop testing
A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.