Free engineering calculators and unit convertersceo@instrumentationblog.in
Maintenance · Free Template

Instrument Failure Root Cause Analysis Template

Investigate instrument failures with a structured form: what happened, a 5 why analysis to reach the root cause, the cause category and a tracked list of corrective actions.

Excel (.xlsx)Printable PDFFilled exampleFree, no sign up

Download

  • How to Use sheet with steps
  • Template sheet, blank and ready
  • Example sheet, filled in
  • 20 built in formulas
  • A4 portrait print setup
  • Works in Excel, Google Sheets and LibreOffice

Preview of the Filled Example

This is the Example sheet from the download, so you can see exactly how the completed instrument failure root cause analysis looks.

Instrument tagLT 2101
Date of event18 Oct 2026
What happenedDrum level read 20 % high; high level alarm missed real low level
ImpactBoiler trip on low level, 4 h downtime
Root cause categoryMaintenance
TeamInstrument, operations, process

5 why analysis

WhyQuestionAnswer
1Why did level read high?Wet leg on LP side had partly drained
2Why did the wet leg drain?Leaking vent valve on the condensate pot
3Why was the leak not found?Wet leg check not in the PM schedule
4Why was it not in the schedule?PM template copied from dry leg transmitters
5Why was the template not reviewed?No review step when PMs are created

Corrective actions

NoActionOwnerDueDoneStatusRemarks
1Replace vent valve and refill wet legInstrument19 Oct 202618 Oct 2026Closed
2Add wet leg checks to PM for all wet leg loopsMaintenance planner13 Nov 2026Open
3Add review step for new PM templatesMaintenance manager23 Nov 2026Open
Open actions:2  ·  Overdue:0
Advertisement

About the Instrument Failure Root Cause Analysis

Repeated instrument failures usually have system causes such as missing checks or poor design. A short 5 why analysis with tracked actions stops the same failure coming back.

How to fill in this template

  1. Describe the event and its impact factually.
  2. Ask why up to five times until you reach a cause you can fix in the system.
  3. Pick the root cause category.
  4. Agree corrective actions with owners and due dates.
  5. Track actions to closure; status updates automatically.

What the formulas do

  • Status: Closed when a done date is entered; OVERDUE when past due; otherwise Open.

Related tools

Advertisement

Frequently Asked Questions

Must there be exactly five whys?

No, stop when you reach a cause that, if fixed, prevents recurrence.

Who should take part?

Instrument, operations and anyone with first hand knowledge.

What makes a good action?

Specific, owned, dated and aimed at the system cause, not only the broken part.

You May Also Like

Learn more on the blog

Instrumentation calibration and troubleshooting guide

A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.

Read Full Article

More Maintenance Templates

All Templates and Downloads