Commissioning · Free Template

Site Acceptance Test (SAT) Checklist Template

An 18 point site acceptance test checklist covering the steps from power up to handover, with acceptance criteria and an automatic SAT status.

Excel (.xlsx)Printable PDFFilled exampleFree, no sign up

Download

  • How to Use sheet with steps
  • Template sheet, blank and ready
  • Example sheet, filled in
  • 8 built in formulas
  • A4 landscape print setup
  • Works in Excel, Google Sheets and LibreOffice

Preview of the Filled Example

This is the Example sheet from the download, so you can see exactly how the completed site acceptance test (sat) checklist looks.

ProjectBoiler 3 control system upgrade
ClientABC Process Industries Ltd
SystemPLC panel CP 03, HMI 1, HMI 2
SiteUtilities block, Pune plant
SAT start date02 Nov 2026
SAT procedureSAT PROC 03 Rev 0

Test checklist

NoSectionCheck itemAcceptance criteriaResultRemarks
1Pre requisitesFAT punch items closed or acceptedNo open category A itemsPASS
2Pre requisitesPanel installed, levelled, earthed and glandedAs per layout and earthing drawingsPASS
3Pre requisitesField installation checklists and cold loop checks completeSigned records availablePASS
4PowerUPS and power distribution energised, voltages checkedWithin ± 5 % of nominalPASS
5PowerEarth resistance of instrument earth pitAs specified, typically ≤ 1 ΩPASS
6SystemSystem healthy after power up, no diagnostic alarmsAll cards and nodes healthyPASS
7SystemTime synchronisation across controllers and HMIsAll nodes show the same timePASS
8LoopsHot loop checks of all field instrumentsLoop check sheets signedPASS
9LoopsControl valves stroked from HMIPosition matches demandPASS
10LoopsMotor start / stop and feedback from MCCCorrect status and fault indicationPASS
11CommunicationLinks to MCC, VFDs, analysers and package PLCsLive data verifiedPASS
12CommunicationLink to plant historian / MESTags updatingFAILHistorian OPC tags not updating; firewall rule pending

… and 6 more rows in the download.

PASS:15  ·  FAIL:1  ·  Not yet tested:2  ·  SAT status:FAIL
Advertisement

About the Site Acceptance Test (SAT) Checklist

The site acceptance test is the final proof that the control system works with the real plant: real instruments, real valves, real motors and real communication links. It is the gate between construction and operation, and its signed checklist is often a contractual milestone for payment.

How to fill in this template

  1. Confirm the pre requisites first: SAT should not start until installation and cold loop checks are complete.
  2. Work through the checklist with the client and operations representatives.
  3. Record PASS, FAIL or NA and remarks. Raise punch items for every FAIL.
  4. SAT status turns PASS only when every row is tested and none has failed.
  5. Sign off and include the checklist in the handover dossier.

What the formulas do

  • Counts of PASS, FAIL and untested rows.
  • SAT status: FAIL if any failure, CHECK while rows remain untested, else PASS.

Related tools

Advertisement

Frequently Asked Questions

When is SAT performed?

After installation, cold loop checks and power up at site, and before the plant is handed over for start up.

Is SAT the same as commissioning?

SAT is part of commissioning. Commissioning continues with process start up and performance tests.

What happens to failed SAT items?

They go on the punch list with an owner and target date, and are retested before final handover.

You May Also Like

Learn more on the blog

Cold loop and hot loop testing procedures

A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.