Free engineering calculators and unit convertersceo@instrumentationblog.in
Maintenance · Free Template

ESD Valve Full Stroke Test Report Template

A proof test record for emergency shutdown and on/off valves. Enter the required stroke times and the measured times for each trial; the sheet compares them and gives the result.

Excel (.xlsx)Printable PDFFilled exampleFree, no sign up

Download

  • How to Use sheet with steps
  • Template sheet, blank and ready
  • Example sheet, filled in
  • 30 built in formulas
  • A4 portrait print setup
  • Works in Excel, Google Sheets and LibreOffice

Preview of the Filled Example

This is the Example sheet from the download, so you can see exactly how the completed esd valve full stroke test report looks.

Tag numberXV 4101
ServiceTank inlet shutdown valve
Valve type and sizeBall valve, 6", 150#, fire safe
ActuatorSpring return, scotch yoke
Fail actionFail close
SIF / SILSIF 04, SIL 1
Required closing time (s, max)10
Required opening time (s, max)15
Test date12 Oct 2026
Proof test interval12 months
Seat leak test done?Yes, Class VI, no visible leak
Solenoid valve vents correctly?Yes
Air supply pressure (bar)5.5
Bypass / override removed after test?Yes

Stroke tests

TrialCommandInitiated fromMeasured time (s)Limit (s)Limit switch feedback OK?Smooth travel, no sticking?ResultRemarks
1CloseSIS logic7.810YesYesPASS
2OpenDCS11.215YesYesPASS
3CloseLocal push button7.910YesYesPASS
4OpenDCS11.015YesYesPASS
5CloseSIS logic7.710YesYesPASS
6OpenDCS11.115YesYesPASS
Slowest closing time (s):7.9  ·  Slowest opening time (s):11.2  ·  Overall result:PASS
Advertisement

About the ESD Valve Full Stroke Test Report

Shutdown valves sit still for months and must move instantly when demanded. Under IEC 61511, every safety instrumented function must be proof tested at the interval assumed in its SIL calculation, and the final element is usually the least reliable part. A stroke test with measured times is the core of that proof test.

How to fill in this template

  1. Obtain a permit and operations approval; put the valve in a safe state for testing (bypass the trip only if your procedure allows).
  2. Enter the required closing and opening times from the SIF specification (safety requirements specification).
  3. Initiate each stroke from the source shown and time it from command to limit switch change with a stopwatch or the SIS sequence of events.
  4. Record feedback and travel quality; any No makes the trial fail.
  5. Remove bypasses, return the valve to service and file the report against the SIF proof test record.

What the formulas do

  • Limit = required closing time for Close trials, required opening time for Open trials.
  • Result PASS when measured time ≤ limit and feedback and travel checks are not No.

Related tools

Advertisement

Frequently Asked Questions

What is a full stroke test of an ESD valve?

Moving the valve completely closed and open from the safety system while measuring the stroke time and checking the limit switches.

How is a full stroke test different from a partial stroke test?

A partial stroke test moves the valve about 10 to 20 % without stopping the process; it finds some failures but not seat leakage or full travel problems.

Where does the required closing time come from?

From the safety requirements specification of the SIF, based on the process safety time.

You May Also Like

Learn more on the blog

Partial stroke testing: 5 ways to improve valve SIL

A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.