Free engineering calculators and unit convertersceo@instrumentationblog.in
Maintenance · Free Template

Earthing Resistance Test Record Template

Record earth pit and bonding resistance tests with the method used, the limit for each point, the result and the next due date.

Excel (.xlsx)Printable PDFFilled exampleFree, no sign up

Download

  • How to Use sheet with steps
  • Template sheet, blank and ready
  • Example sheet, filled in
  • 104 built in formulas
  • A4 landscape print setup
  • Works in Excel, Google Sheets and LibreOffice

Preview of the Filled Example

This is the Example sheet from the download, so you can see exactly how the completed earthing resistance test record looks.

Site / plantUtilities area
Earth tester and cert. noEarth tester, CC 24803
Test interval (months)12
Season / soilDry season

Earthing results

NoEarth pointDescriptionTypeMethodMeasured (Ω)Limit (Ω)ResultTest dateNext dueRemarks
1EP 01Main instrument earth pitEarth pitFall of potential0.801.00PASS20 Oct 202620 Oct 2027
2ISE 01IS earth bar to main earthIS earthContinuity0.301.00PASS20 Oct 202620 Oct 2027
3EP 04Tank farm earth pitEarth pitFall of potential6.405.00FAIL20 Oct 202620 Oct 2027Add electrode, water pit
Points tested:3  ·  Points failed:1
Advertisement

About the Earthing Resistance Test Record

Good earthing protects people, equipment and signals, and is essential for zener barrier intrinsic safety. Periodic records show deterioration of earth pits and bonds.

How to fill in this template

  1. Enter the tester and interval.
  2. For each point, enter the limit from your design.
  3. Test with the stated method and record the reading.
  4. Failed points need maintenance and retest.
  5. Next due date is calculated automatically.

What the formulas do

  • Result = PASS if measured ≤ limit.
  • Next due = test date + interval.

Related tools

Advertisement

Frequently Asked Questions

What is the fall of potential method?

A three electrode test that measures the resistance of an earth electrode to remote earth.

What limit applies to IS earth?

IEC 60079-14 requires a low resistance connection, commonly less than 1 Ω, for zener barrier earths.

Why test in dry season?

Soil resistance is highest then, giving the worst case.

You May Also Like

Learn more on the blog

What is galvanic isolation

A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.

Read Full Article

More Maintenance Templates

All Templates and Downloads