Instrument Installation Checklist Template

A 16 point inspection checklist for field instruments: mounting, impulse lines, process connections, cable glands, earthing and protection. Mark each item and the sheet shows whether the installation is ready for loop check.

Excel (.xlsx)Printable PDFFilled exampleFree, no sign up

Download

  • How to Use sheet with steps
  • Template sheet, blank and ready
  • Example sheet, filled in
  • 4 built in formulas
  • A4 portrait print setup
  • Works in Excel, Google Sheets and LibreOffice

Preview of the Filled Example

This is the Example sheet from the download, so you can see exactly how the completed instrument installation checklist looks.

Tag numberPDT 3105
Instrument typeDP transmitter (flow, orifice)
ServiceFeed flow to column C 301
Hook up drawingHU DP LIQ 03
Area / locationColumn area, EL +3.5 m
Hazardous areaZone 2, IIB T3
Make and modelYokogawa EJA110E
Inspection date12 Oct 2026

Installation checks

NoCheck itemStatusRemarks
1Correct instrument installed (tag, model, range and material match data sheet)OK
2Tag plate fixed and legibleOK
3Mounted as per hook up drawing, accessible for maintenanceOK
4Mounting bracket or stand secure, free from vibrationOK
5Process connection orientation correct (gas: above tap, liquid: below tap)OK
6Impulse lines sloped correctly (1:12 minimum) and supportedOK
7Manifold / isolation valves fitted and operableOK
8Impulse lines and fittings pressure tested and leak freeOK
9Seal pots, condensate pots or diaphragm seals filled as requiredOK
10Cable gland type and size correct, Ex certified for the zoneNot OKM20 gland on M25 entry, replace with M25 Ex d gland
11Cable entry sealed, unused entries plugged with certified plugsOK
12Cable supported, protected and identified at both endsOK

… and 4 more rows in the download.

Items not OK:1  ·  Ready for loop check?:CHECK
Advertisement

About the Instrument Installation Checklist

Most commissioning problems start as installation errors: wrong impulse line slope, a leaking fitting, a non certified gland in a hazardous area or a missing earth. An installation checklist signed before loop checking catches these early, when they are cheap to fix.

How to fill in this template

  1. Fill in the instrument and area details, including the hazardous area classification.
  2. Inspect each item in the field and select OK, Not OK or NA. Add a remark for every Not OK.
  3. Raise a punch item for every Not OK (see the punch list template).
  4. Reinspect after correction; the sheet shows OK when no items remain Not OK.

What the formulas do

  • Items not OK = count of "Not OK".
  • Ready for loop check shows CHECK while any item is Not OK.

Related tools

Advertisement

Frequently Asked Questions

When should the installation checklist be completed?

After mechanical installation and before cold loop and hot loop checks.

Why does impulse line slope matter?

Gas lines must drain liquid back to the process and liquid lines must vent gas back to the process; otherwise trapped fluid causes measurement errors.

Who signs the installation checklist?

The installer, the inspecting engineer and usually the client QA/QC representative.

You May Also Like

Learn more on the blog

Hook up drawing: 6 essential typicals for safe installation

A practical guide on instrumentationblog.in that explains the procedure behind this template and how engineers apply it on real plants.

Read Full Article

More Commissioning Templates

All Templates and Downloads